Second Long-Term (LT2) Request For Proposals
Ontario’s electricity demand is forecast to rise over the long term, prompting the IESO’s ongoing large-scale resource procurement efforts to ensure sufficient supply will be available into the 2030s and beyond.
The LT2 RFP is the IESO’s primary competitive mechanism to procure capacity resources, which are capable of providing supply specifically during periods of peak demand; and energy resources, which generate electricity over a longer period of time.
To maintain the province’s reliable, affordable, and sustainable grid, the IESO plans to run multiple windows of the LT2 RFP, each with a distinct capacity and energy stream.
LT2 RFP Updates
Engagement for the second window of the energy and capacity stream of the Long-Term 2 Request for Proposals (LT2(e-2) RFP and LT2(c-2) RFP) has begun. The first set of draft RFP and Contract documents for the LT2(e-2) RFP (energy stream) can be found below. The first set of draft RFP and Contract documents for the LT2(c-2) RFP (capacity stream) will be posted in the near future.
The IESO has concluded the first window of the energy and capacity stream of the Long-Term 2 Request for Proposals (LT2(e-1) RFP and LT2(c-1) RFP) and has executed Contracts with the Selected Proponents. Details of these procurements are provided at the bottom of this page.
For information about previous and upcoming engagement sessions, please visit the IESO’s Long-Term RFP Stakeholder Engagements webpage.
Any general enquiries regarding the LT2 RFP can be sent to LT2.RFP@ieso.ca.
The Long-Term 2 Request For Proposals ("LT2 RFP") and the statements and information contained therein, are based on the proposed design as of the date of posting and remain subject to amendment following the process set out in the LT2 RFP. Nothing in the LT2 RFP, or the posting thereof, obligates the IESO to continue or conduct the procurement process contemplated herein, or any other procurement process. Nothing in the posted LT2 RFP or contract constitutes, nor shall it be construed to constitute, an agreement, guarantee, representation, or warranty, express or implied, on behalf of the IESO. The IESO provides no such agreement, guarantee, representation, or warranty and disclaims any and all liability associated therewith. In the event there is any conflict or inconsistency between the LT2 RFP or contract, and the IESO market rules, any legislation or regulation, the terms in the market rules, legislation, or regulation as applicable, govern.
LT2 RFP Procurement Documents
LT2(e-2) RFP Documents – Energy Documents
Draft LT2(e-2) RFP Documents
- Draft LT2(e-2) RFP (August 14, 2026)
- Draft LT2(e-2) RFP Blacklined to Final LT2(e-1) RFP (August 14, 2026)
- Draft LT2(e-2) Contract (August 14, 2026)
- Draft LT2(e-2) Contract Blacklined to Final LT2(e-1) Contract (August 14, 2026)
Archived Procurement Documents
Results
The first window of the energy stream of the Long-Term 2 Request for Proposals (LT2(e-1) RFP) has now concluded. The IESO executed Contracts with 13 Selected Proponents, totaling 1,115.10 MW of Maximum Contract Capacity and an aggregate Expected Annual Imputed Production of 2.37 TWh.
More details can be found in the LT2(e-1) RFP final results table.
The first window of the capacity stream of the Long-Term 2 Request for Proposals (LT2(c-1) RFP) has now concluded. The IESO executed Contracts with three (3) Selected Proponents, representing a total of 640.00 MW of Maximum Contract Capacity.
More details can be found in the LT2(c-1) RFP final results table.
Final LT2(e-1) RFP Documents
- LT2(e-1) RFP – Consolidated with Addendum No. 1 (September 5, 2025)
- LT2(e-1) Contract – Consolidated with Addendum No. 1 (September 5, 2025)
- LT2(e-1) RFP Consolidated – Blacklined to June 27, 2025 (September 5, 2025)
- LT2(e-1) Contract Consolidated – Blacklined to June 27, 2025 (September 5, 2025)
- LT2(e-1) RFP – Addendum No. 1 (August 14, 2025)
- LT2(e-1) RFP (June 27, 2025)
- LT2(e-1) RFP – Blacklined to May 15, 2025 (June 27, 2025)
- LT2(e-1) Contract (June 27, 2025)
- LT2(e-1) Contract – Blacklined to May 15, 2025 (June 27, 2025)
Final LT2(e-1) RFP Prescribed Forms
- Registration Form: LT2(e-1) PF-REG100 (June 27, 2025)
- Registration Workbook: LT2(e-1) PF-RW100 (June 27, 2025)
- Access Rights: LT2(e-1) PF-AR100 (June 27, 2025)
- Confirmation of Unincorporated Territory: LT2(e-1) PF-CUT100 (June 27, 2025)
- Economic Bid Statement: LT2(e-1) PF-EB100 (June 27, 2025)
- Evidence of Indigenous Support: LT2(e-1) PF-IS100 (v2) (October 1, 2025)
- Evidence of Municipal Support: LT2(e-1) PF-MS100 (v2) (October 1, 2025)
- Evidence of Indigenous Community Participation: LT2(e-1) PF-IP100 (v2) (October 1, 2025)
- Notice of Proposal Withdrawal: LT2(e-1) PF-NW100 (June 27, 2025)
- Proponent Information, Declaration and Workbook: LT2(e-1) PF-PI100 (June 27, 2025)
- Proposal Workbook: LT2(e-1) PF-PW100(v3) (September 23, 2025)
Other LT2(e-1) RFP - Energy Documents
- LT2(e-1) Fixed Price Tool (Energy) (June 27, 2025)
- LT2(e) RFP Preliminary Connection Guidance V4 (May 15, 2025)
- LT2(e) RFP – Evaluation Stage Deliverability Test Methodology for Long-Term 2 Energy Supply (Window 1) Request for Proposals V2 (January 10, 2025)
Final LT2(c-1) RFP Documents
- LT2(c-1) RFP - Consolidated with Addendum No. 1, No. 2, No. 3 & No. 4 (November 10, 2025)
- LT2(c-1) Contract - Consolidated with Addendum No. 1, No. 2 and No. 3 (November 4, 2025)
- LT2(c-1) RFP Consolidated - Blacklined to June 27, 2025 (November 10, 2025)
- LT2(c-1) Contract Consolidated - Blacklined to September 11, 2025 (November 4, 2025)
- LT2(c-1) RFP - Addendum No. 4 (November 10, 2025)
- LT2(c-1) RFP – Addendum No. 3 (November 4, 2025)
- LT2(c-1) RFP – Addendum No. 2 (August 14, 2025)
- LT2(c-1) RFP - Addendum No. 1 (July 9, 2025)
- LT2(c-1) RFP (June 27, 2025)
- LT2(c-1) RFP - Blacklined to May 15, 2025 (June 27, 2025)
- LT2(c-1) Contract (June 27, 2025)
- LT2(c-1) Contract - Blacklined to May 15, 2025 (June 27, 2025)
Final LT2(c-1) RFP Prescribed Forms
- Registration Form: LT2(c-1) PF-REG100 (June 27, 2025)
- Registration Workbook: LT2(c-1) PF-RW100 (June 27, 2025)
- Access Rights: LT2(c-1) PF-AR100 (June 27, 2025)
- Confirmation of Unincorporated Territory: LT2(c-1) PF-CUT100 (June 27, 2025)
- Economic Bid Statement: LT2(c-1) PF-EB100 (June 27, 2025)
- Evidence of Indigenous Support: LT2(c-1) PF-IS100 (v2) (October 1, 2025)
- Evidence of Municipal Support: LT2(c-1) PF-MS100 (v2) (October 1, 2025)
- Evidence of Indigenous Community Participation: LT2(c-1) PF-IP100 (June 27, 2025)
- Notice of Proposal Withdrawal: LT2(c-1) PF-NW100 (June 27, 2025)
- Proponent Information, Declaration and Workbook: LT2(c-1) PF-PI100 (June 27, 2025)
- Proposal Workbook: LT2(c-1) PF-PW100(v3) (September 23, 2025)
Other LT2(c-1) RFP - Capacity Documents
- LT2(c) RFP Preliminary Connection Guidance & Evaluation Stage Deliverability Test Methodology V3 (August 14, 2025)
LT2 General Procurement Documents
- LT2 Proposal Submission – Process Overview, Best Practices and Common Mistakes V2 (December 9, 2025)
- LT2 Registration – Process Overview & Best Practices (August 21, 2025)
- Revenue Model Update
- Resource Adequacy Update
- LT2 Crown Land Shapefile Guidelines (April 23, 2025)
- LT2 Indigenous Consultation Information Package (May 15, 2025)
- IESO Generalized Tx Connection Cost Reference (August 14, 2025)
- IESO LT2 RFP Bank Confirmation Letter
LT2 Questions and Responses
- LT2 FAQ V9 (June 17, 2026)
- LT2 Questions and Comments - Batch 1 (July 9, 2025)
- LT2 Questions and Comments - Batch 2 (July 22, 2025)
- LT2 Questions and Comments - Batch 3 (August 14, 2025)
- LT2 Questions and Comments - Batch 4 (August 28, 2025)
- LT2 Questions and Comments – Batch 5 (September 5, 2025)
Agricultural Impact Assessment (AIA) Resources
- OMAFA Guidelines for the LT2 AIA Components Two and Three Requirement (November 4, 2025)
- OMAFA Guidelines for the AIA Component One Requirement (May 27, 2025)
- LT2 Agricultural Impact Assessment Q&A V4 (November 4, 2025)
General LT2 Connection Guidance
- LT2 RFP Preliminary Connection Guidance Map Request (September 10, 2024)
- Procedure to Request a Consultation (September 6, 2024)