The IESO is piloting an auction-based mechanism for procuring Energy Efficiency (EE) to inform long-term discussions about enabling EE to compete to meet system needs through an appropriate market-based mechanism. In particular, the IESO is seeking to understand the receptivity of the EE market to participating in auction-style procurements as well as the benefits to the system of acquiring EE through this type of competitive mechanism.
Specific pilot learning objectives include assessing the interest and ability of different sectors to participate in EE auctions, discovering the price for EE when competition for delivery is enabled, and better understanding various implementation issues.
The IESO will seek feedback from stakeholders on:
Additional details on the IESO’s plans to engage with stakeholders can be found in the engagement plan. All comments and enquiries on this engagement can be directed to engagement@ieso.ca.
Anticipated timing for this engagement is presented below.
Documents referenced on this page, but not posted, can be obtained by contacting engagement@ieso.ca with a link to the web page that lists the document and advise whether it needs to be provided in an accessible format. Please allow a minimum of one business day for a response.
Timing | Engagement Activity |
---|---|
Phase 2 - Detailed Design |
|
February 17, 2021 |
|
November 12, 2020 |
Public webinar to provide an overview of the main steps required to participate in the Auction Pilot
|
November 11, 2020 |
Clarifications to detailed design documents posted |
June 30, 2020
|
Design of energy efficiency pilot auction finalized
|
June 9, 2020 |
Additional feedback from stakeholders due on two areas of the Energy Efficiency Auction Pilot design: 1) A proposed revised timeline responding to the COVID‐19 public health crisis, and 2) Options to encourage successful auction participants to voluntarily provide hourly meter data from facilities. |
May 19, 2020
|
|
April 16, 2020 |
|
April 13, 2020
|
Stakeholder feedback due on the draft detailed design of the auction pilot including the proposed resource participant agreement terms, Measurement and Verification (M&V) procedures, and timeline
|
March 23, 2020
|
Public webinar to seek feedback on specific elements of the detailed design of the auction with a window for written stakeholder feedback
|
Phase 1 - High Level Design |
|
February 28, 2020 |
|
November 20 – December 6, 2019 |
Window for written submissions on high level design materials
IESO Response to Stakeholder Feedback |
November 20, 2019 |
Public webinar to seek feedback on high level design, processes, timelines and resource eligibility
|
November 7, 2019 |
Beginning of phase one engagement |