2017 Solar Eclipse

Ontario experienced a partial solar eclipse on Monday August 21, 2017, between 1:10 p.m. EDT and 3:50 p.m. EDT. The eclipse over Ontario reached its peak coverage at approximately 2:30 p.m. EDT. This celestial event was unique as it is the first solar eclipse to take place since large amounts of solar generation has been installed across North America.

Leading up to August, 21, the IESO planned extensively for this unique event and communicated widely with Ontario electricity sector partners, including its interconnected neighbours, as well as weather and solar forecasters to plan the day’s power system operations accordingly.

partial solar eclipse

What We Experienced: Solar Generation and Electricity Demand Impacts

Before the eclipse

Prior to the beginning of the event, output of embedded solar generation, that is generation connected within Ontario’s local distribution systems, was approximately 1,470 megawatts (MW) with grid-connected (transmission-connected) solar generation at approximately 350 MW.

Just prior to the onset of the eclipse, industrial load declined. This decrease in demand is consistent with an Industrial Conservation Initiative (ICI) reduction, as 2:00 p.m. EDT to 3:00 p.m. EDT was forecast to be the peak hour for the day.

During the eclipse

At the peak of the eclipse, which occurred at around 2:33 p.m. EDT, solar generation output was reduced consistent with the IESO’s forecast – to approximately 490 MW for embedded solar generation and approximately 115 MW for grid-connected generation. The total reduction in solar generation output was approximately 1,220 MW, which represents about 67 percent of the pre-eclipse solar generation output. 

Solar eclipse graph of  August 21, 2017

 

During the first half of the event, demand did not increase as expected but remained relatively flat. This is believed to be primarily due to social activity surrounding the eclipse event itself. By the end of the eclipse at 3:50 p.m. EDT, embedded solar generation had recovered to approximately 1,250 MW with grid- connected generation recovering to approximately 280 MW.

During the eclipse, there were no power system reliability issues in Ontario.

Resources of Interest

  • The IESO held an information webinar for interested parties on August 3, 2017. For more information and to access the presentation slides see the Public Information Sessions webpage.
  • IESO tweeted system status updates during the solar eclipse. Read the August 21 tweets on Twitter.

Solar Generation in Ontario

There is approximately 2,300 MW of solar generation in Ontario – this is roughly the same amount of power needed to meet peak summer electricity demand for Ottawa and Brampton combined. Of these megawatts, 2,000 are located on local distribution networks (also known as embedded generation) across the province, and the remaining megawatts are transmission-connected.

Transmission-connected solar generation by facility is reported hourly through the Generator Output and Capability report.