Attendees are invited to participate in any or all of the sessions. Each of the sessions will be held as a separate meeting as shown in the agenda below. Pre-registration is recommended for each of the sessions you plan on attending.
Meeting Materials
For meeting materials, please click on the title of the session to access the engagement webpage where documents are posted.
The IESO will provide the sector with an update on the ERP Distributed Energy Resources (DER) project with a focus on the bi-directional operational visibility design topic.
The IESO is proposing formal market rule changes to standardize energy ramp rate requirements for Battery Energy Storage System (BESS) Facilities to address rapidly increasing capacity of BESS resources with fast-ramping capabilities and associated operational challenges.
The IESO will present the new technical requirements for connecting large computational loads and share stakeholder feedback received along with the IESO’s responses and considerations addressing the feedback.