2012 Ontario Reliability Compliance Program Schedule

Each year NERC, NPCC Inc., and the IESO select a subset of reliability standards for monitoring. Market Participants are required to provide reliability compliance information under the IESO’s Ontario Reliability Compliance Program (ORCP).

The schedule for reliability compliance submissions by market participants is shown in the table below. 2012 ORCP Schedule and History of Changes Download (Published February 7, 2013). The schedule for reliability compliance submissions by the IESO is available here.

Please note the forms below are for information purposes only. Market Participants must submit the electronic certification forms using the IESO Reliability Compliance Tool accessed via the IESO Web Portal.

Included in 2011 ORCP? NERC Standards Group NERC
Standard
NPCC
Document
Document Title Reporting Frequency MP Target Submission Date NERC Functional Model Entity Form
Y     Directory 12 Section 5.4 Generator Underfrequency Protection Requirements Annual 22-Aug-12 G 1718 Survey
Y     Directory 12 Section 5.2 Automatic Underfrequency Load Shedding consistent with NPCC's UFLS program requirement Annual 22-Aug-12 T, D, W 1719 Survey
Y       Emergency Preparedness Planning Market Rules Chapter 5 - Power System Reliability Market Manual 7.10 - Ontario Electricity Emergency Plan Annual 25-Jul-12   1608
Y       Emergency Restoration Planning Market Manual 7.8 - Ontario Power System Restoration Plan (a) Annual 25-Jul-12   1609
New EOP EOP-001-0
EOP-001-0b
  Emergency Operations Planning Annual 23-Aug-12 TOP 1750
New COM COM-001-1.1   Telecommunications Annual 23-Aug-12 TOP 1751
New COM COM-002-2   Communication and Coordination Annual 06-Jun-12 GOP, TOP 1747
New PRC PRC-017-0   Special Protection System Maintenance and Testing Annual 04-Jul-12 DP, GO, TO 1748
Y PRC PRC-023-1   Transmission Relay Loadability Annual 06-Jul-12 DP, GO, TO 1738
New EOP EOP-005-1   System Restoration Plans Annual 23-Aug-12 TOP 1752
New EOP EOP-008-0   Plans for Loss of Control Center Functionality Annual 23-Aug-12 TOP 1753
New IRO IRO-005-2a
IRO-005-3a
  Reliability Coordination - Current Day Operations Annual 03-Aug-12 GOP 1749
Y FAC FAC-008-1   Facility Ratings Methodology Annual 27-Sep-12 GO, TO 1623
Y FAC FAC-009-1   Establish and Communicate Facility Ratings Annual 27-Sep-12 GO, TO 1624
Y CIP CIP-001-1a
CIP-001-2a
  Sabotage Reporting Annual 29-Oct-12 GOP, TOP 1610
Y CIP CIP-002-3   Cyber Security — Critical Cyber Asset Identification (b) Annual 29-Oct-12 GO, GOP, TO 1694
Y CIP CIP-003-3   Cyber Security — Security Management Controls (b) Annual 29-Oct-12 GO, GOP, TO 1695
Y CIP CIP-004-3   Cyber Security — Personnel & Training (b) Annual 29-Oct-12 GO, GOP, TO 1696
Y CIP CIP-005-3a   Cyber Security — Electronic Security Perimeter(s) (b) Annual 29-Oct-12 GO, GOP, TO 1697
Y CIP CIP-006-3c   Cyber Security — Physical Security of Critical Cyber Assets (b) Annual 06-Nov-12 GO, GOP, TO 1698
Y CIP CIP-007-3   Cyber Security — Systems Security Management (b) Annual 06-Nov-12 GO, GOP, TO 1699
Y CIP CIP-008-3   Cyber Security — Incident Reporting and Response Planning (b) Annual 06-Nov-12 GO, GOP, TO 1700
Y CIP CIP-009-3   Cyber Security — Recovery Plans for Critical Cyber Assets (b) Annual 06-Nov-12 GO, GOP, TO 1701
New IRO IRO-004-2   Reliability Coordination - Operations Planning Annual 04-Jan-13 TOP 1759
Y FAC FAC-003-1   Transmission Vegetation Management Program Annual 04-Jan-13 TO 1526
New PER PER-002-0   Operating Personnel Training Annual 04-Jan-13 TOP 1760
Y PRC PRC-001-1   System Protection Coordination Annual 04-Jan-13 GOP, TOP 1637
Y PRC PRC-004-1a   Analysis and Mitigation of Transmission and Generation Protection System Misoperations Annual 04-Jan-13 DP, GO, TO 1522
1523
New PRC PRC-005-1a
PRC-005-1b
  Transmission and Generation Protection System Maintenance and Testing Annual 04-Feb-13 DP, GO, TO 1761
New PRC PRC-008-0   Implementation and Documentation of Underfrequency Load Shedding Equipment Maintenance Program Annual 04-Feb-13 DP, TO 1762
New PRC PRC-011-0   Undervoltage Load Shedding System Maintenance and Testing Annual N/A DP, TO 1763
Y TOP TOP-002-2b
TOP-002-2.1b
  Normal Operations Planning Annual 04-Feb-13 GOP, TOP 1643
New TOP TOP-004-2   Transmission Operations Annual 04-Feb-13 TOP 1764
New VAR VAR-001-1
VAR-001-2
  Voltage and Reactive Control Annual 04-Feb-13 TOP 1765
Y VAR VAR-002-1.1b   Generator Operation for Maintaining Network Voltage Schedules Annual 04-Mar-13 GO, GOP 1571
Y EOP EOP-009-0   Documentation of Blackstart Generating Unit Test Results (c) Annual 04-Mar-13 GO, GOP 1532
New MOD MOD-010-0   Steady-State Data for Modeling and Simulation of the Interconnected Transmission System Annual 04-Mar-13 GO, TO 1766
New MOD MOD-012-0   Dynamics Data for Modeling and Simulation of the Interconnected Transmission System Annual 04-Mar-13 GO, TO 1767
New PRC PRC-007-0   Assuring Consistency of Entity Underfrequency Load Shedding Programs Annual 04-Mar-13 DP, TO, TOP 1768
New PRC PRC-021-1   Under-Voltage Load Shedding Program Data Annual N/A DP, TO 1769
Y FAC FAC-003-1   Transmission Vegetation Management Program Quarterly *   TO 1527
New EOP EOP-004-1   Disturbance Reporting Exception Reporting **   GOP, TOP  
New IRO IRO-004-2   Reliability Coordination — Operations Planning Exception Reporting **   TOP  
New PER PER-003-0
PER-003-1
  Operating Personnel Credentials Exception Reporting **   TOP  
New PRC PRC-016-0.1   Special Protection System Misoperations Exception Reporting **   DP, GO, TO  
New TOP TOP-005-2a   Operational Reliability Information Exception Reporting **   TOP  
New TOP TOP-007-0   Reporting SOL and IROL Violations Exception Reporting **   TOP  
* The IESO encourages market participants to report within 48 hours of confirmation.
** Any identified exceptions to these standards shall be self-reported immediately to the IESO.
(a) Applicable to those market participants identified by the IESO as Restoration Participants.
(b) Applicable to those market participants identified by the IESO as owners of Critical Assets.
(c) Applicable to certified black start facility owners.
 