Home > Participate > Change Management > Change Notification Listing

Change Notification Listing

The list below provides advance notice of pending changes to the Market Rules, market manuals, technical interfaces, or other items that define the operation of the IESO-administered market. For changes that are minor, the listing will identify the document that is changing and a description of the changes, but a link to the altered document may not be included.

Comments regarding implementation concerns can be sent to pending.changes@ieso.ca. For more information, see Market Rule Amendment Process.

Details of all of the documents being revised for this baseline are available in the Current Baseline Plan.

Details of documents changing for the next baseline (if available) are in the Next Baseline Plan.

Document Type:   
Item Last Updated Comments Due Target Implementation
24-Feb-201710-Mar-2017March 31, 2017 in advance of Baseline 37.1
​Revised to include registration requirements for residential type of demand response.
24-Feb-201710-Mar-2017March 31, 2017 in advance of Baseline 37.1
​Specifies requirements for Residential type participation in demand response.
23-Feb-2017Baseline 37.0
​There are no changes to the data tables in the form. Instructions to fill the planned outage table is changed to make the requirements clearer with examples.
13-Feb-201721-Feb-2017Baseline 37.0
​Amend section 8.12 OPA Administration Credit/Charge, since the charge types mentioned in this section are no longer effective.
10-Feb-201722-Feb-2017Baseline 37.0
​The template will now have a generic IESO signatory.
27-Jan-201710-Feb-2017Baseline 37.0
​Updated to add applicability guidance information for NERC standards IRO-010-2, TOP-003-3, PRC-005-6, and VAR-002-4.
27-Jan-201710-Feb-2017Baseline 37.0
Corrected footnote references related to MrNh Code in Section 6.6.
26-Jan-201709-Feb-2017February 23, 2017
​Revising Market Manual 4.2 (Appendix D) and Market Manual 7.2 (Sections 3 and 4.4, as well as Appendices A and D) to reflect the use of dynamic peak hours in pre-dispatch scheduling and the related Adequacy Report updates.
24-Jan-201706-Feb-2017Baseline 37.0
​"Feasibility studies" will now be referred to as "technical feasibility study."
23-Jan-201703-Feb-2017Baseline 37.0
Updated List of Resources for Physical Bilateral Contracts for 2016 year end.
 
20-Jan-201703-Feb-2017Baseline 37.0
​To provide more clarity to connection applicants regarding the feasibility study product.
20-Jan-201703-Feb-2017Baseline 37.0
​The term "feasibility study" modified to "technical feasibility study."
Certification section of form modified to include a declaration that the project is not being developed in response to an IESO procurement.
20-Jan-201703-Feb-2017Baseline 37.0
​The term "feasibility study" modified to "technical feasibility study."
Certification section of the form modified to include a declaration that the project is not being developed in response to an IESO procurement.
20-Jan-201703-Feb-2017Baseline 37.0
​The term "feasibility study" modified to "technical feasibility study."
Certification section of form modified to include a declaration that the project is not being developed in response to an IESO procurement.
20-Jan-201703-Feb-2017Baseline 37.0
​The term "feasibility study" modified to "technical feasibility study."
Certification section of form modified to include a declaration that the project is not being developed in response to an IESO procurement. Additional phrases referencing the Market Manual have been added to align with other feasibility study application forms.
19-Jan-201702-Feb-2017Baseline 37.0
Revisions made to this manual incorporate the IESO Board recommendations for the TR Auctions.
​Market Manual 7: System Operations Part 7.3 - Outage Management (IMP_PRO_0035)
11-Jan-2017Baseline 37.0
​The outage planning guideline described in section 3.2.2 is being updated. Due to the confidential nature of the guideline, impacted participants will be notified of the changes on an individual basis.
04-Jan-201727-Jan-2017Baseline 37.0
​Added new Degraded Transmission System Performance section (2.4.3).
26-Oct-201609-Nov-2016Deferred to Baseline 37.1
Revisions made to this manual describe the process changes made as a result of the replacement Reliability Compliance Tool.

There are no entries under this Document Type selection